← Back$800 saved per unit.
How We Calculate This
$800 saved per unit.
889 hours per project.
Based on a 100-unit building with 80 deficiencies per unit, at a blended site + office labor rate of $90/hr. Every number below is auditable.
Assumptions
100
Units in building
80
Deficiencies per unit
$90
Blended hourly rate
180s
Manual on-site / deficiency
240s
Manual office / deficiency
20s
Constralabs / deficiency
Time Breakdown
Total saved — 100-unit project
889 hrs
≈ $80,010 in labor cost
Per unit delivered
$800
533 min saved per unit
* On-site manual time includes finding the issue, photo-taking, notes, and trade assignment. Office time includes report compilation, formatting, review, and follow-up updates. Constralabs logs each issue in 20 seconds and keeps the report editable and trackable.